Shed assembly in Macclesfield

In short

We build timber apex and pent sheds, log stores and bike stores on the base you've prepared, felt the roof and hang the door. A typical 6x4 or 8x6 shed takes three to six hours with two people. The base isn't included.

Price:
From £120*
Typical time:
3–6 hours, depending on size
People:
Two people
Get a free quoteSend the product code or link and we'll price it on the call.

Also called: wooden shed assembly · shed erecting · log store assembly · bike store assembly

What the job involves

A timber shed goes up in a fixed order. The floor goes down first, on its bearers, onto your base. The four wall panels are screwed to the floor and to each other at the corners, and the gable or pent panels go on top. Then come the roof boards, the felt and the door.

Squaring is what decides how good the shed is. If the walls lean even slightly, the door binds on the frame and the roof boards don't meet the edges. We check the diagonals before the roof goes on, while there's still time to pull it straight.

Windows go in last. Most budget sheds use styrene glazing held by beading, and some better ones use toughened glass. Either way, it's fitted after the frame is square so it isn't stressed.

Roof felt, done properly

Felt is where DIY sheds most often fail. It needs to be laid with the overlaps running downhill, tacked at the spacing the instructions give, and turned down over the edges before the fascia boards go on. Cut it short or lay the overlap the wrong way and the first heavy rain finds its way in.

Felting the supplied roll is part of our timber shed job. Upgraded roofs, like shingles or rubber membranes, take longer, so mention them when you ask for a price.

Treatment and the timber

Most kit sheds are either dip-treated or pressure-treated. Dip-treated timber usually needs a treatment coat soon after it goes up, and regularly after that. Pressure-treated timber needs less. Your maker's leaflet says which you have and what it needs.

Overlap cladding is cheaper and more prone to warping, while tongue and groove is stiffer and squares up more easily. Either can be built well on a level base.

Common variations

Apex sheds
Pitched roof with two gables. More headroom, and a little more roof work.
Pent sheds
A single sloping roof. Good against a fence, and quicker to felt.
Log stores
Open-fronted and smaller. Often done alongside a shed on the same visit.
Bike stores
Low and wide, with doors or a lifting lid that need careful alignment.
Sheds with windows or double doors
More glazing and hanging time than a plain shed.

What to have ready

  • A level, firm base in place, sized as the instructions require
  • Clear access from the street to the base
  • All the panels and the roof felt, still packed, near the base if possible
  • The product name or link, so we can check the parts list

What it costs

JobGuide price
Shed assemblyShed price, no base. Larger sheds and extras such as shingles are confirmed on the call.From £120
Minimum charge£40

Guide prices for labour only, per item. Your exact price is confirmed on the call before anything is booked — it depends on size, how many items and access. Booking 3 or more items takes 10% off the labour. All prices →

Add-ons

  • Packaging removal£15Boxes, polystyrene and wrapping taken away.
  • Roof feltingAsk on the callFitting the felt or shingles supplied with a timber building.
  • Fitting an anchor kitAsk on the callGround or base anchors for sheds, trampolines and play frames.
  • Taking apart the old oneAsk on the callDismantling the item you're replacing, ready for you to dispose of.
  • 3 or more itemsAsk on the call10% off the labour when three or more items are booked together.

Common questions

How long does it take to put up a wooden shed?

Two people usually build a 6x4 shed in about three hours, while an 8x6 or 10x8 is nearer five or six. Sheds with extra windows, double doors or a shingle roof take longer.

Is roof felting included?

Yes, for the felt that comes with the shed. If you've bought shingles or a different roofing material, tell us when you ask for a price, as it adds time.

Can you build a shed on grass?

Not directly. The timber floor needs a level, firm base underneath, such as slabs, concrete or a base kit. On bare grass, the floor rots and the frame twists out of square.

Will you treat the shed after building it?

Ask when you book. Whether it needs treating right away depends on the timber, so check the maker's leaflet. Some dip-treated sheds need a coat within weeks.

How booking works

  1. 1Tell us what needs buildingSend the product code or a link to the listing, how many boxes there are, and a photo of the room or stairs if access is awkward.
  2. 2It goes to one assemblerYour details go to the Macclesfield assembler and no one else. Nothing is put up for bidding or passed round.
  3. 3Your assembler calls youOne call from the person who'll do the work, to talk it through, give you a price and book a time.
  4. 4Furniture builtBuilt, levelled and checked, with tall pieces fixed to the wall where the maker supplies a restraint. Packaging taken away or flattened.

More on how it works →

Need help with shed assembly?

Tell us what you've bought — the product code or a link helps — and we'll call you back, usually the same day. Free quote, no obligation.

← All garden buildings jobs

Boxes in the hallway? Let's get them built.

Tell us what needs building and it goes straight to our Macclesfield assembler — one callback, usually the same day. The quote is free and there's no obligation.